MUVE Health
West Chester, PA
Fit out of Class C Surgery Center with two (2) ORs and seven (7) adjoining Suites for post-operative recovery.
- Class C ASC with two (2) ORs, Five (5) PACU/Recovery Beds and Two (2) Pre-op Rooms
- Installed new 480V electrical service
- New water service with meter pit for 3″ domestic line and RPZ
- Installed Xetex AHU as required for OR procedures
- Managed install of med gas system and SPD area with washer, sterilizer, pass through window, three basin sink and other equipment provided by Steris
- Seven (7) Adjoining Stay Suites for post-operative recovery, zoned as R-4